Skip to content
PlayOwl

What If? Lab

What if tunnels could be dug anywhere?

A tunnel is a road or railway that goes under the ground. Giant machines dig them. Could we dig a tunnel anywhere?

Tunnels carry trains, cars and water through mountains and under rivers. But digging one is hard: the ground can be solid rock or soft mud, and water is always trying to get in. Explore how tunnel builders hold back rock and water, and how giant boring machines dig and line a tunnel as they go.

Tunneling depends on the ground: Britannica distinguishes soft ground, hard rock, soft rock and subaqueous work, and notes that difficulty grows with opening size, weak ground and water inflow. This thought experiment asks what would change if tunnels could go anywhere, and why, in reality, geology and groundwater decide where and how they are dug.

Explore

The big question

Trains zoom through tunnels under hills and rivers.

What if we could dig a tunnel anywhere we liked?

Imagine you could dig a tunnel anywhere: straight through a mountain, under a wide river, or beneath a busy city. Trips could be shorter and roads could stay out of sight.

But real tunnel builders cannot just dig wherever they want. Some ground is hard rock that must be cut or blasted; some is soft mud that would fall in; and almost everywhere, water seeps toward any hole. In this lab we follow three clues: hard rock and soft mud, tunnel-boring machines, and tunnels under rivers.

Every tunnel is a negotiation with geology. The ground's strength, its fractures, its temperature and the water it holds decide whether a tunnel is possible at a given site, how it is excavated and supported, and what it costs.

This thought experiment imagines a world without those constraints and then asks what engineers actually do about them. It follows three threads: hard rock versus soft ground, the tunnel-boring machine (TBM) that digs and lines in one pass, and the long struggle to tunnel beneath rivers. History and engineering come from Britannica, HS2, the American Society of Civil Engineers and Guinness World Records; the 'dig anywhere' world is a set of ideas.

Explore the idea

Make a prediction

What do tunnel builders worry about most when digging under a river?

Digging a tunnel under a river, what problem do builders have to fight most?

For a subaqueous tunnel in soft ground, which hazard did the shield and compressed air chiefly address?

  • Water getting in
  • Too much sunlight
  • Strong wind
  • Established fact

    The ground decides how a tunnel is dug.

    Tunnel methods depend on whether the ground is soft, hard rock, soft rock or under water, and water inflow is a constant challenge.

    Ground type and water inflow govern tunneling method and difficulty; most long rock tunnels have met inflows (Britannica).

  • Established fact

    Big machines dig tunnels and build the walls as they go.

    Tunnel-boring machines dig and line a tunnel with concrete segments as they move forward.

    TBMs excavate, line with precast segments and grout in one process; HS2's averaged about 15–16 m per day (HS2).

  • An idea scientists discuss

    If we could dig anywhere, trips might be shorter.

    If tunnels could be dug anywhere, routes might be straighter and shorter, though they might not all be worth building.

    Unconstrained tunneling might shorten routes; real constraints of heat, stress and water make this a thought experiment.

  • Established fact

    Tunnel builders must know what the ground is made of.

    Tunnel methods depend on the ground: soft ground, hard rock, soft rock or ground under water.

    Excavation methods vary with soft ground, hard rock, soft rock and subaqueous conditions; difficulty grows with weak ground and water inflow (Britannica).

  • An idea scientists discuss

    If we could dig anywhere, trains might go straight through mountains.

    If tunnels were easy anywhere, railways might go straight through mountains instead of around them.

    Unconstrained tunneling might favor straighter, shorter routes; whether each would be worth its cost is a separate question.

  • Established fact

    Engineers check how long the ground stays up by itself.

    Engineers check the ground's 'stand-up time,' how long it stays up before it needs support.

    Engineers assess stand-up time to decide when to install support such as steel ribs and concrete linings (Britannica).

  • Established fact

    Deep in a mountain, tunnel builders found very hot water.

    Builders of the Simplon tunnel under the Alps met water as hot as 130°F (54°C).

    The Simplon tunnel (1898–1906) met rock bursts, swelling ground and 130°F (54°C) water (Britannica).

  • An idea scientists discuss

    Some places might always be too hard to dig.

    Even with great machines, some ground might stay too hot, wet or weak to tunnel through.

    Extreme depth, heat and water may keep some routes impractical regardless of machine improvements.

  • Established fact

    The first modern tunnel boring machine dug in 1954.

    The first successful modern tunnel-boring machine, the 'Mittry Mole,' dug at Oahe Dam in South Dakota in 1954.

    The Mittry Mole (1954, Oahe Dam) began the modern era; moles raised rates from 25–50 ft/day to several hundred ft/day (Britannica).

  • Established fact

    Two big machines dug a 10-mile tunnel in England.

    HS2's machines Florence and Cecilia dug a 10-mile twin tunnel under the Chiltern Hills, finishing in 2024.

    Florence and Cecilia completed HS2's 10-mile Chiltern twin bore in 2024, up to 80 m deep, excavating three million cubic meters of chalk (HS2).

  • An idea scientists discuss

    Maybe someday machines will dig even faster.

    Faster machines might make more tunnels possible, but ground and water would still decide where they go.

    Faster TBMs might lower costs, but geology would still limit where tunnels are feasible.

  • Established fact

    The first real tunnel under a river was finished in 1841.

    Marc and Isambard Brunel finished the first true underwater tunnel, under the Thames, in 1841.

    The Brunels' Thames tunnel, begun in 1825 with the first shield, was completed in 1841: 1,200 ft in nine years' work (Britannica).

  • Established fact

    Air pressure can help keep water out of a tunnel.

    In 1874, James Henry Greathead added compressed air inside the tunnel to hold back the water outside.

    Greathead (1874) pressurized the tunnel to resist outside water pressure; lining segments were erected under the shield tail (Britannica).

  • An idea scientists discuss

    Maybe more rivers could have tunnels under them.

    If tunneling under water were easy everywhere, more rivers and bays might have tunnels instead of bridges.

    Cheaper subaqueous tunneling might shift some crossings from bridges to tunnels; the balance depends on cost, ground and navigation.

Rock, mud and water

Some ground is hard rock. Some is soft mud.

And water likes to leak into holes. Tunnel builders must hold back the rock, the mud and the water.

Britannica sorts tunnel jobs by the ground they pass through: soft ground, hard rock, soft rock and ground under water. In hard rock, crews have long drilled holes and used explosives to break the rock. In soft ground, the danger is that the earth caves in before it can be supported.

Engineers talk about stand-up time: how long the ground will stay up by itself before it needs support such as steel ribs or a concrete lining. Water makes everything harder. Britannica notes that most long rock tunnels have had problems with water flowing in.

Britannica classifies tunneling by ground type (soft ground, hard rock, soft rock and subaqueous) and describes common stages: investigation, excavation and muck removal, ground support and environmental control. Engineers assess stand-up time, how long an unsupported opening remains stable, to decide when to install support.

Stable openings rely on the ground-arch effect, which transfers load around the opening to its sides; steel ribs and concrete linings share that load. Weak ground calls for smaller headings supported in stages. Most long rock tunnels have met water inflows, and unexpected ground or water can stop work, change designs and raise costs, which is why geological investigation comes first.

Dig anywhere?

Let's pretend we can dig anywhere, easily.

Maybe trains could go straight through every mountain! But real ground can be hard, soft, wet or hot.

If tunnels could be dug anywhere, easily and cheaply, maybe railways would run straight through mountains instead of winding around them, and roads could go underground beneath crowded cities. Those are our ideas, not predictions.

In the real world, the ground pushes back. When the Simplon railway tunnel was dug under the Alps around 1900, Britannica says, crews met rock that burst from the walls, soft rock that swelled and squeezed in, and water as hot as 130°F (54°C). Deep underground can be a hot, wet, high-pressure place.

Remove geological limits and the obvious ideas follow: straighter, shorter routes through mountains and under cities and water. Whether they would be worth building is a separate question of cost and use.

Real geology imposes those limits. Britannica's account of the Simplon tunnel (1898–1906), nearly 7,000 feet below the mountain crest, lists rock bursts from highly stressed rock, swelling weak schists and gypsum that required 10-foot-thick masonry lining in places, and water at 130°F (54°C). Driving it as two parallel tunnels linked by crosscuts helped ventilation and drainage. Deep tunneling is a fight with stress, heat and water.

Machines that dig and line

Today, giant machines called tunnel boring machines dig tunnels.

They cut the ground at the front. Then they build the tunnel wall right behind them!

Modern tunnels are often dug by tunnel-boring machines, or TBMs. The first successful modern one, the 'Mittry Mole,' dug through soft rock at Oahe Dam in South Dakota in 1954. Since then, Britannica says, machines like it have raised tunneling speeds from 25 to 50 feet a day to several hundred feet a day in good ground.

A TBM is like a factory underground. HS2, a British railway project, describes its machines Florence and Cecilia, each weighing 2,000 tonnes, digging through chalk and lining the tunnel with precast concrete segments, grouting them into place and moving forward about 15 to 16 meters a day.

The modern tunnel-boring machine, or mole, dates from the 'Mittry Mole' of 1954 at Oahe Dam, South Dakota, in readily cut clay-shale. Since 1960, Britannica notes, moles have raised advance rates from 25–50 feet per day to several hundred feet per day.

A TBM excavates and supports in one continuous process. HS2's two 2,000-tonne machines, Florence and Cecilia, finished a 10-mile twin-bore tunnel under the Chiltern Hills in early 2024, at depths up to 80 m, excavating three million cubic meters of chalk. Each worked as an underground factory, installing 56,000 precast concrete segments, grouting them and advancing about 15–16 m per day on average. Greathead's 19th-century shield already erected permanent lining segments under its protective tail.

Tunnels under rivers

Long ago, digging under a river was very hard. Water kept getting in!

A clever shield helped workers dig safely under the River Thames in London.

For a long time, tunneling under rivers was thought impossible. Then engineer Marc Brunel invented the tunneling shield, a strong frame that protected workers while they dug. With his son Isambard, he began a tunnel under the River Thames in London in 1825. Water broke in several times, but in 1841 they finished the world's first true underwater tunnel, 1,200 feet long.

Later engineers added compressed air inside the tunnel to hold back the water. Since 1950, many underwater tunnels are made a different way: long tube sections are built, floated out, sunk into a trench and joined together.

Britannica credits Marc Brunel with the protective shield, first used with his son Isambard in 1825 on the Wapping–Rotherhithe tunnel through clay beneath the Thames. After several floodings from sand pockets and a seven-year pause, they completed the world's first true subaqueous tunnel in 1841: nine years' work for 1,200 feet.

In 1869 Peter Barlow and James Henry Greathead built a second, smaller Thames tunnel in one year using a circular shield and cast-iron lining segments; in 1874 Greathead added compressed air inside the tunnel to resist water pressure. Since 1950 most underwater crossings have used immersed tubes, prefabricated sections floated to the site, sunk into a dredged trench and joined, first used in this form for the Detroit River railroad tunnel (1906–10).

Amazing facts

  • Tunnel machines are given names, like Florence and Cecilia.

    HS2's tunnel-boring machines had names: Florence and Cecilia dug the 10-mile Chiltern tunnel.

    HS2 named its Chiltern TBMs Florence and Cecilia; Cecilia's breakthrough in March 2024 completed the twin bore (HS2).

  • The first tunnel for cars needed giant fans.

    The Holland Tunnel under the Hudson River, finished in 1927, was the first tunnel designed specially for cars and trucks. Huge fans pushed fresh air in to clear the fumes.

    Clifford Holland and Ole Singstad solved exhaust-gas ventilation for the Holland Tunnel (1927) with large fans driving air through ducts below and above the roadway (Britannica).

  • Some underwater tunnels are made in pieces and sunk into place.

    Many underwater tunnels are built as long tubes on land, floated out, sunk into a trench and joined together.

    Immersed tubes: prefabricated sections floated to site, sunk in a dredged trench, connected and backfilled; most subaqueous tunnels since 1950 (Britannica).

Words to know

tunnel-boring machine
a giant machine that cuts a round tunnel and lines it as it moves forward (TBM)
tunneling shield
a strong frame that protects workers at the front of a tunnel while they dig
stand-up time
how long dug-out ground stays up by itself before it needs support
lining
the strong wall, often of concrete segments, that holds up the inside of a tunnel
groundwater
water held in soil and rock under the ground

Discovery challenge

  1. What does a tunnel boring machine build behind itself?

    What does a tunnel-boring machine install behind its cutting head?

    What does a TBM erect as it advances?

    • Concrete wall segments
    • Railway stations
    • Bridges
    Show the answer

    Concrete wall segments

    The tunnel walls, made of concrete pieces.

    Precast concrete segments that line the tunnel.

    Precast lining segments, grouted into place (HS2).

  2. What is the biggest problem when digging under a river?

    What problem did shields and compressed air help with under rivers?

    Greathead's compressed air was used to resist what?

    • Water getting in
    • Strong sunlight
    • Loud noise
    Show the answer

    Water getting in

    Water trying to get in.

    Keeping water out of the tunnel.

    Outside water pressure (Britannica).

  3. When was the first real tunnel under a river finished?

    In what year did the Brunels finish their tunnel under the Thames?

    When was the first true subaqueous tunnel completed?

    • 1841
    • 1954
    • 2016
    Show the answer

    1841

    In 1841.

    1841, after work began in 1825.

    1841: nine years' work for 1,200 feet (Britannica).

Experiments to try

Explore next

For parents & teachers

What children will learn

  • Tunneling methods depend on the ground: soft ground, hard rock, soft rock or under water.
  • Holding back water is one of the biggest challenges in tunneling.
  • Tunnel-boring machines dig and line a tunnel with concrete segments as they go.
  • Deep tunnels can meet high rock stress, heat and hot water.

Recommended ages: 11 to 17 ยท About 15 minutes

Talk about it

  • Where would you put a tunnel near your home, and what might be under the ground there?
  • Why might engineers choose a bridge instead of a tunnel, or the other way around?
  • Why do you think tunnel builders study the ground before they dig?

Try at home or in class

  • In a tray of damp sand, push a cardboard tube in sideways, then scoop sand out of it with a spoon. Compare with digging the same hole without the tube.
  • Fill a clear cup with layers of gravel, sand and soil, then pour in water and watch where it collects.

Key vocabulary: tunnel-boring machine, tunneling shield, stand-up time, lining, groundwater

Where these facts come from

  1. Tunnels and underground excavations , Encyclopaedia Britannica
  2. Tunnels and underground excavations: Tunneling techniques , Encyclopaedia Britannica
  3. Final breakthrough for HS2's longest tunnel , HS2 Ltd
  4. Holland Tunnel , American Society of Civil Engineers (Historic Civil Engineering Landmarks)
  5. Longest rail tunnel , Guinness World Records

Checked, not yet human-reviewed. Last updated October 26, 2026. Spotted a mistake? Tell us.